Status notes on manual instruments:
The new triple-quad has been installed! Contact Mohan if you would like to know how it may help in your research program
The FTIR is out for repair; the interferometer has failed
The high-vacuum pump on the EPR has failed, but most of the system has been rebuilt. The system is still down; see the EPR Slack channel for further updates
The 401 now had 19F capability - however, we are waiting on a power supply that failed. Check the reservation page for updates.
Status notes on automation instruments:
-- Sarah has set up the JEOL to handle VT experiments; please see her for details and training
Please report any problems or questions you have to us at dcifhelp@mit.edu so we can help!